Malls · Canada
Oakridge Centre
Oakridge Centre, a 2026 mall, is being redeveloped into a high-density mixed-use complex with first phase opened May 2026 today. · summary, model-written
Solid = from the authors' map · outlined = public source · dashed = model-written, not yet reviewed by a person. Tap any value's source label to see where it came from. documented = a quoted excerpt (click to read it) · reported = a source named, no excerpt yet · no source.
Site profile11 elements · what this retrofit is built with · tap a chip for the evidence
Attention rising (Wikipedia views +50% y/y)
This site: 18,400 views, +103% wikimedia · all sites with thisRetrofit in the pipeline
This site: …under construction extraction · all sites with thisWebsite dead or redirecting
This site: overture / http check · all sites with thisRail within 800 m
This site: Langara-49th Avenue, Oakridge-41st Avenue openstreetmap · all sites with thisBuilding footprint 50,000+ m²
This site: 53,605 m² overture · all sites with thisRedeveloped
This site: The first phase of the newly branded Oakridge Park opened in May 2026. extraction · all sites with thisCivic and government
This site: …new_use field extraction · all sites with thisHousing
This site: …akridge Park opened in May 2026. The redevelopment includes residential towers as part of the high-density urban complex. extraction · all sites with thisOffice
This site: …new_use field extraction · all sites with thisPark and open space
This site: The first phase of the newly branded Oakridge Park opened in May 2026. The redevelopment includes residential extraction · all sites with thisRetail (continued)
This site: …new_use field extraction · all sites with thisNow
| Status | Under constructionextracted, unreviewed documentedThe site is being redeveloped through a CA$6.5 billion high-density urban complex |
|---|---|
| Strategy | Redevelopment, under constructionextracted, unreviewed documentedThe site is being redeveloped through a CA$6.5 billion high-density urban complex |
| New uses | housing, office, civic, park, retailextracted, unreviewed reported |
| What is there now | The first phase of the newly branded Oakridge Park opened in May 2026.extracted, unreviewed |
| Retrofit year | 2026extracted, unreviewed reported |
Planning
| Planning notes | The redevelopment includes residential towers as part of the high-density urban complex.extracted, unreviewed reported |
|---|
Site context
| Transit within 800 m | Langara-49th Avenue, Oakridge-41st Avenue (rail); 10 bus stops within 400 mOpenStreetMap |
|---|---|
| Other atlas sites nearby | 2 within 10 km, 3 within 25 km: Station Square (8.4 km); Brentwood Town Centre (9.5 km)computed |
| Overture Maps | place Apple Oakridge Centre (electronics_store, confidence 0.97, from Microsoft, Overture); building footprint 53,605 m²Overture (CDLA-Permissive 2.0) |
| Website and social | (down or redirecting, status None)Overture / Internet Archive |
| Attention: Wikipedia page views | 31,244 since 2015; 18,400 in the last 12 months (+103% vs the prior 12); peak 2026-05 with 4,858Wikimedia |
Summary, model-written
Oakridge Centre opened as a mall in 2026 and immediately began a redevelopment strategy to transform the site into a high-density mixed-use complex. The first phase of the newly branded Oakridge Park opened in May 2026, featuring residential towers, office space, a community centre, a rooftop park, and luxury retail. The project remains under construction as additional phases are completed.
Why. not stated in the record
Where it stands. The site is currently under construction as part of the Oakridge Park redevelopment; the controlling entity is not specified in the record.
For a planner
- High-density mixed-use redevelopment incorporating housing, office, civic, park, and retail uses.
- Phased opening approach with the first residential and retail component already operational.
- Located at a major transit intersection (West 41st Avenue & Cambie Street), suggesting transit‑oriented development potential.
- Open questions include full build‑out timeline, affordability provisions, and integration with the existing Oakridge neighbourhood.
For a developer
- Site size and exact ownership are not provided in the record.
- Entitlement stage: under construction with first phase completed (May 2026).
- Constraints from flood, transit, or environmental layers are unknown based on the record.
- Market signals from surrounding tract data are not available in the record.
What we do not know yet
- Original mall opening date and anchor tenant losses are not documented.
- Reasons for redeveloping (e.g., declining sales, debt, competition) are not stated.
- Ownership, financing details, and total project cost beyond the cited CA$6.5 billion are unspecified.
- Exact site dimensions, zoning designations, and any environmental or flood‑risk constraints are missing.
- The fields year_opened, year_retrofit, and status are marked as extraction‑only and the record is flagged as draft, indicating potential unreviewed model‑generated data.
Generated by nvidia/nemotron-3-super-120b-a12b on NVIDIA API via Hermes CT from the fields, parcels, deals and context layers on this page, with no outside knowledge. It is regenerated when the record changes and has not been checked by a person. How it is made.
Similar sites
- Billerica Mall, Billerica, MA · Malls · same strategy: redevelop
- Festival Flea Market Mall, Pompano Beach, FL · Malls · same strategy: redevelop
- Monmouth Mall, Eatontown, NJ · Malls · same strategy: redevelop
- Northland Center, Southfield, MI · Malls · same strategy: redevelop
Elsewhere on the web
Pages with photos
- Oak leaf at oakridge centre (Unsplash) commons.wikimedia.org
- Oakridge Centre Retailers to Close Until 2024 Amid Vancouver Mall Redevelopment [Exclusive] retail-insider.com
- This video shows how part of the Oakridge Centre will look - Vancouve… vancouverisawesome.com
- New park at Oakridge Centre: updated design concepts revealed - urbanYVR urbanyvr.com
- Oakridge Centre mall in Vancouver changing hands reminetwork.com
- Oakridge Centre, Vancouver — Stores, Map & Hours | … getoccupi.com
- Vancouver’s Oakridge Centre converts a 1950s mall to a modern-day hub ... theglobeandmail.com
Search images: Google · Bing · Commons · references: ULI case studies · Google Scholar
History and original facts
| Opened | 2026extracted, unreviewed |
|---|---|
| Notes | Wikipedia categories: Defunct shopping malls in Canada |
Not yet recorded: acres, GLA, original developer. Know it? Tell us.
Background
Oakridge Park is a major mixed-use development and shopping centre in the Oakridge neighbourhood of Vancouver, British Columbia, Canada. It is located at the intersection of West 41st Avenue and Cambie Street. The site is being redeveloped through a CA$6.5 billion high-density urban complex featuring residential towers, office space, a community centre, a rooftop park, and a luxury retail district opening in phases. The first phase of the newly branded Oakridge Park opened in May 2026.
Excerpt from Wikipedia (authors and history), CC BY-SA 4.0. May be older than the record above.
Timeline
- 2026 First phase opened
Sources
- Wikipedia: Oakridge Centre · supports: after notes, status, strategy, year opened
5 quoted sentences
The first phase of the newly branded Oakridge Park opened in May 2026.
The first phase of the newly branded Oakridge Park opened in May 2026.
The site is being redeveloped through a CA$6.5 billion high-density urban complex
The site is being redeveloped through a CA$6.5 billion high-density urban complex
More in Canada
Surrey Central CitySurrey, CanadaReinhabited
Alberni MallPort Alberni, Canada · 2007Redeveloped · The first two new tenants for the mall as part of its revitalization…
Algo Centre MallElliot Lake, Canada · 2019Redeveloped · The city of Elliot Lake purchased the vacant former Algo Centre Mall…Ayre's Department Store (Avalon Mall)St. John's, CanadaRedeveloped · Reinhabited · expansion of mall interior... Scotiabank and across from that Gap…Billings Bridge Shopping CentreOttawa, Canada · 1972Redeveloped · converted into an enclosed mall and a twelve-storey office tower was…