Retrofit Atlas

Office parks · England

Esher flats

Imported, unreviewedReinhabitedRetrofit approvedEsher, England

Approved office-to-housing conversion (16 flats) with draft verification; strategy matches US peers but no UK context or timeline. · summary, model-written

Ask who owns this Download dossier (PDF) · early access Download record (JSON) API Share LinkedIn Correct this record

Solid = from the authors' map · outlined = public source · dashed = model-written, not yet reviewed by a person. Tap any value's source label to see where it came from. documented = a quoted excerpt (click to read it) · reported = a source named, no excerpt yet · no source.

Site profile4 elements · what this retrofit is built with · tap a chip for the evidence

Finance and pipeline
Retrofit in the pipelineThis site: …approved newtypes-extraction · all sites with this
Strategy
ReinhabitedThis site: Two neighbouring office buildings can become 16 flats record · all sites with this
New use
HousingThis site: …new_use field newtypes-extraction · all sites with this
OfficeThis site: Two neighbouring office buildings can become 16 flats newtypes-extraction · all sites with this

All elements and lists · Trends

Now

StatusRetrofit approvednewtypes-extraction reported
StrategyReinhabitation, approvedWikipedia no source
New useshousingWikipedia no source
What is there nowTwo neighbouring office buildings can become 16 flatsnewtypes-extraction reported

Summary, model-written

Approved conversion of two office buildings (original use: office) into 16 housing units. Strategy: reinhabit. Status: approved (verified as draft).

Why. After_notes specifies two neighboring office buildings will become 16 flats. Peer context shows 6 similar 'reinhabit' conversions (all US-based), but no location relevance to Esher.

Where it stands. Conversion approved but verification pending (draft). No timeline, cost, or exact address provided. Peer examples are US-based but strategy match is noted.

For a planner

  • Approved office-to-housing conversion
  • 16 flats from two existing buildings
  • Strategy aligns with 6 peer 'reinhabit' cases

For a developer

  • Draft-verified project
  • No financials or timeline in record
  • Peer examples show strategy viability but location context not transferable

What we do not know yet

  • Status: approved but draft (not final)
  • No details on building condition or costs
  • Peer examples are US-based; no UK context provided

Generated by qwen3-30b-a3b-64k:latest on Dell 5820 RTX 3090 (Ollama, qwen3-30b-a3b) from the fields, parcels, deals and context layers on this page, with no outside knowledge. It is regenerated when the record changes and has not been checked by a person. How it is made.

Similar sites

Elsewhere on the web

Search images: Google · Bing · Commons · references: ULI case studies · Google Scholar

History and original facts

NotesDraft from planninggeek.co.uk, model-extracted, unreviewed: Two neighbouring office buildings in Esher were approved for conversion into 16 flats under Class MA, subject to daylight and sunlight conditions.

Not yet recorded: acres, GLA, year opened, original developer, retrofit year. Know it? Tell us.

Sources

More in England