Strip centers · Oregon
Cedar Hills Shopping Center
Active housing/retail redevelopment under construction; housing market metrics support strategy; six nearby peers redeveloping. · summary, model-written
Solid = from the authors' map · outlined = public source · dashed = model-written, not yet reviewed by a person. Tap any value's source label to see where it came from. documented = a quoted excerpt (click to read it) · reported = a source named, no excerpt yet · no source.
Site profile4 elements · what this retrofit is built with · tap a chip for the evidence
Retrofit in the pipeline
This site: …under construction record · all sites with thisRedeveloped
This site: record · all sites with thisHousing
This site: …new_use field record · all sites with thisRetail (continued)
This site: …new_use field record · all sites with thisNow
| Status | Under constructionWikipedia no source |
|---|---|
| Strategy | Redevelopment, under constructionWikipedia no source |
| New uses | housing, retailWikipedia no source |
| Redeveloper | High Street Residentialnewtypes-extraction reported |
Planning
| Entitlement year | 2022Wikipedia no source |
|---|---|
| Planning notes | Approved by Beaverton.Wikipedia no source |
Site context
| Housing permits, Washington County (OR), 2024 | 236 units in 5+ unit buildings, 13 in 2–4, 2,024 single-family; 2023: 741 in 5+Census BPS |
|---|---|
| Other atlas sites nearby | 0 within 10 km, 6 within 25 kmcomputed |
| Retail trade in the county, 2025 (BLS QCEW) | 31,811 jobs in 1,582 establishments; average annual pay $48,195; employment location quotient 1.06; employment -0.7% on the yearBLS QCEW 2025, NAICS 44-45, private |
| Jobs located in the tract, 2022 | 1,762 jobs; 96 in retail trade, 251 in accommodation and food (workplace blocks summed to tract 41067031404)Census LEHD LODES8 WAC 2022 |
| Upward mobility (Opportunity Atlas, 2010 tract) | children of low-income (25th percentile) families reached the 45th income percentile as adults; 2.7% incarcerated at the 2010 count (475 children in the sample); born 1978–83, measured 2014–15Opportunity Insights |
| Food access (USDA FARA 2019, 2010 tract) | not a low-access tract at 1 mile; poverty rate 9.7%; median family income $97,514; 278 SNAP householdsUSDA ERS |
| Schools | Beaverton School District 48J (KG-12); 4 public schools within 1 mile: Arts and Communication Magnet Academy; Barnes Elementary School; William Walker Elementary School; Cedar Park Middle SchoolNCES EDGE |
| Elevation | 269 ft above sea level at the site pointUSGS 3DEP |
| Storm events in the county, 2016-2025 | 22 county-logged events: 11 flood, 3 thunderstorm wind, 2 funnel cloud, 2 heavy rain; $218,000 property damage reported; 1 direct deaths; forecast-zone events (most flood, winter and heat) not countedNOAA Storm Events |
| Homes for sale in ZIP 97225, 2026-09 | median list price $725,200 (-7.0% on the year); 80 active listings; median 51 days on market; 33% with a price cutRealtor.com Research |
| Retail trade in the county, 2012 to 2023 | 1,588 establishments (-0%); 32,810 jobs (+15%)Census CBP |
| Housing market in the county | typical home value $555,664 (-2% 1 yr, +6% 5 yr); typical rent $1,906/mo (+0% 1 yr), 2026-09Zillow Research |
| Traffic on the busiest road within 600 m (2024) | 27,699 vehicles a day (minor arterial, 4 lanes); 1,247 trucks; 5 counted segmentsFHWA HPMS |
Summary, model-written
Cedar Hills Shopping Center (strip format) is under construction as a redevelopment into housing and retail, led by High Street Residential. Entitlements were approved by Beaverton in 2022. Permits show 2024 construction activity with 2024 units (1-4 units) and 236+ units (5+), totaling $821M value. Housing market context: median rent $1,773, ZHVI $555,664 (down 1.5% YoY). Washington County grew 3.2% 2018-23. Six peer projects in the region are similarly redeveloping malls (within 25km). Traffic: minor arterial (4 lanes, 27,699 ADT). Unknown: exact parcel size, specific address, current occupancy, or retail tenant mix. Record lacks site-specific traffic volume or demographic data beyond county-level metrics.
Why. Status is active (under construction), approvals secured, housing demand supported by median rent and ZHVI, peer density indicates regional trend. No data on site-specific challenges or retail viability.
Where it stands. Active redevelopment in progress; market context aligns with housing strategy. No site-specific retail or traffic volume data provided.
For a planner
- Entitlements approved (2022)
- 6 nearby redeveloping malls
- Housing demand metrics available
- Traffic class: minor arterial (4 lanes)
For a developer
- 2024 permits show active construction
- Median rent $1,773 supports housing strategy
- County growth 3.2% 2018-23
- No site-specific retail data provided
What we do not know yet
- Exact parcel size unknown
- No current retail occupancy data
- Traffic volume (ADT) not tied to site
- No demographic data beyond county-level
Generated by qwen3-30b-a3b-64k:latest on Dell 5820 RTX 3090 (Ollama, qwen3-30b-a3b) from the fields, parcels, deals and context layers on this page, with no outside knowledge. It is regenerated when the record changes and has not been checked by a person. How it is made.
Similar sites
- Jantzen Beach Mall, Portland, OR · Malls · same strategy: redevelop; also in OR; 15 km away
- Mall 205, Portland, OR · Malls · same strategy: redevelop; also in OR; 19 km away
- Bowstring Truss House, Portland, OR · Industrial sites · same strategy: redevelop; also in OR; 10 km away
- 255 Main St., Windsor Locks, CT · Strip centers · same strategy: redevelop
Elsewhere on the web
Search images: Google · Bing · Commons · references: ULI case studies · Google Scholar
Multifamily screen
- already in play: under construction, approved, or sold to a developer with housing plans
- county grew 3.2% 2018–23
- median rent $1,773
- housing in the record
Inputs: record fields (size, status) and county Census ACS 2018–2023 figures (growth, rent). How the points work. Not a recommendation.
History and original facts
| County | Washington County |
|---|---|
| Census division | 9 · Pacific |
| Notes | Draft from cedarmillnews.com, model-extracted, unreviewed: The Cedar Hills Shopping Center, a strip retail center, is being redeveloped into 369 apartments and 5,000 sq ft of retail, with construction underway as of April 2026. |
Not yet recorded: acres, GLA, year opened, original developer, what is there now, retrofit year. Know it? Tell us.
Sources
- Mixed use development getting underway in Cedar Hills
1 quoted sentence
Cedar Hills Shopping Center
More in Oregon
Eastport PlazaPortland, OR · 1996OperatingEugene MallEugene, ORClosed
Jantzen Beach MallPortland, OR · 2012Redeveloped · outdoor shopping mall
Lloyd CenterPortland, ORClosed