Other · Georgia
Hill Street Mixed-Use Development
Proposed mixed-use project on former police HQ site; zoning approved for 2025, but no construction underway. Market data supports housing/retail uses. Nearby active development (Roswell Mall, North River) but no site details. · summary, model-written
Solid = from the authors' map · outlined = public source · dashed = model-written, not yet reviewed by a person. Tap any value's source label to see where it came from. documented = a quoted excerpt (click to read it) · reported = a source named, no excerpt yet · no source.
Site profile10 elements · what this retrofit is built with · tap a chip for the evidence
Retrofit in the pipeline
This site: …proposed newtypes-extraction · all sites with this3+ other atlas sites within 10 km
This site: 9 within 10 km computed · all sites with this30,000+ vehicles a day on an adjacent road
This site: 31,000 on 9 fhwa-hpms · all sites with thisCounty permitting 2,000+ apartment units a year
This site: 8,159 units, Fulton County census-bps · all sites with thisRezoning
This site: Hill Street Overlay District (HSOD) (overlay district) newtypes-extraction · all sites with thisRedeveloped
This site: record · all sites with thisCivic and government
This site: …new_use field record · all sites with thisHousing
This site: …new_use field record · all sites with thisOffice
This site: …new_use field record · all sites with thisRetail (continued)
This site: …new_use field record · all sites with thisNow
| Status | Retrofit proposednewtypes-extraction reported |
|---|---|
| Strategy | Redevelopment, proposedWikipedia no source |
| New uses | civic, housing, office, retailWikipedia no source |
| Redeveloper | Atlantic Companies and The Providence Groupnewtypes-extraction reported |
Planning
| Zoning change | Hill Street Overlay District (HSOD) (overlay district)newtypes-extraction reported |
|---|---|
| Entitlement year | 2025Wikipedia no source |
| Planning notes | Approved by Roswell City Council.Wikipedia no source |
Site context
| Housing permits, Fulton County (GA), 2024 | 8,159 units in 5+ unit buildings, 481 in 2–4, 2,937 single-family; 2023: 7,096 in 5+Census BPS |
|---|---|
| Other atlas sites nearby | 9 within 10 km, 40 within 25 km: Roswell Mall (2.6 km); North River Shopping Center (2.6 km); North Point Mall (8.5 km); Brookside Office Park (8.5 km); Continuum (8.5 km)computed |
| Retail trade in the county, 2025 (BLS QCEW) | 55,938 jobs in 4,327 establishments; average annual pay $50,638; employment location quotient 0.60; employment -2.8% on the yearBLS QCEW 2025, NAICS 44-45, private |
| Jobs located in the tract, 2022 | 2,861 jobs; 302 in retail trade, 264 in accommodation and food (workplace blocks summed to tract 13121011437)Census LEHD LODES8 WAC 2022 |
| Upward mobility (Opportunity Atlas, 2010 tract) | children of low-income (25th percentile) families reached the 41th income percentile as adults; 2.1% incarcerated at the 2010 count (598 children in the sample); born 1978–83, measured 2014–15Opportunity Insights |
| Food access (USDA FARA 2019, 2010 tract) | low-access at 1 mile, not low-income; 15% of residents more than 1 mile from a supermarket; poverty rate 6.1%; median family income $91,624; 360 SNAP householdsUSDA ERS |
| Schools | Fulton County School District (PK-12); 2 public schools within 1 mile: Independence High School; Vickery Mill ElementaryNCES EDGE |
| Elevation | 1,070 ft above sea level at the site pointUSGS 3DEP |
| Storm events in the county, 2016-2025 | 266 county-logged events: 174 thunderstorm wind, 48 flash flood, 34 hail, 10 tornado; $9,525,000 property damage reported; 2 direct deaths; forecast-zone events (most flood, winter and heat) not countedNOAA Storm Events |
| Homes for sale in ZIP 30075, 2026-09 | median list price $795,625 (+2.2% on the year); 203 active listings; median 48 days on market; 21% with a price cutRealtor.com Research |
| Retail trade in the county, 2012 to 2023 | 3,732 establishments (+10%); 55,757 jobs (+14%)Census CBP |
| Housing market in the county | typical home value $414,221 (-2% 1 yr, +11% 5 yr); typical rent $1,926/mo (+3% 1 yr), 2026-09Zillow Research |
| Traffic on the busiest road within 600 m (2024) | 31,000 vehicles a day on 9 (principal arterial, 4 lanes); 1,561 trucks; 40 counted segmentsFHWA HPMS |
Summary, model-written
Proposed mixed-use development on former Roswell Police HQ site. Status: proposed, with Roswell City Council approval noted. Entitlements (zoning change to Hill Street Overlay District) set for 2025. Developer: Atlantic Companies and The Providence Group. New uses: civic, housing, office, retail. No construction underway (status: proposed).
Why. Roswell Mall (2.6km, operating) nearby. County population grew 4.6% 2018–2023. Median rent $1,635. Housing market data shows 1.5% annual rent growth (ZORI). Nearby projects: North River Shopping Center (2.6km, under construction), North Point Mall (8.5km, approved).
Where it stands. Zoning change approved for 2025. No construction permits recorded. Events list site prep/demolition starting 2025. No parcel size or site area provided. No current construction photos or site plans in record. Traffic: 31,000 ADT on principal arterial (4 lanes).
For a planner
- Proximity to operating mall (Roswell Mall) and active construction (North River) indicates market activity. Zoning change approved but no physical progress yet. Traffic data confirms access.
- Housing market data supports residential component (median rent $1,635).
- No details on parcel size or site constraints.
For a developer
- Developer has entitlements pending (2025). Market data aligns with proposed uses (housing/retail).
- Nearby projects (North River, North Point) show active development in corridor.
- No construction permits or site work recorded; timeline is speculative (2025–2027).
- Unknown: Site size, exact timeline, or current land use details beyond police HQ.
What we do not know yet
- Status is 'proposed'—no construction or permits filed. No parcel dimensions or site topography provided. No current ownership or land acquisition status. Traffic data is for 2024 but not site-specific.
Generated by qwen3-30b-a3b-64k:latest on Dell 5820 RTX 3090 (Ollama, qwen3-30b-a3b) from the fields, parcels, deals and context layers on this page, with no outside knowledge. It is regenerated when the record changes and has not been checked by a person. How it is made.
Similar sites
- 3585 Engineering Drive, Peachtree Corners, GA · Other · same strategy: redevelop; also in GA; 14 km away
- Embassy Row 100, Sandy Springs, GA · Other · same strategy: redevelop; also in GA; 11 km away
- Town Center at Cobb, Kennesaw, GA · Malls · same strategy: redevelop; also in GA; 19 km away
- Lotus Grove, Doraville, GA · Big boxes · same strategy: redevelop; also in GA; 15 km away
Elsewhere on the web
Search images: Google · Bing · Commons · references: ULI case studies · Google Scholar
Multifamily screen
- already in play: under construction, approved, or sold to a developer with housing plans
- county grew 4.6% 2018–23
- median rent $1,635
- housing in the record
Inputs: record fields (size, status) and county Census ACS 2018–2023 figures (growth, rent). How the points work. Not a recommendation.
History and original facts
| County | Fulton County |
|---|---|
| Census division | 5 · South Atlantic |
| Notes | Draft from roswellconnections.com, model-extracted, unreviewed: The former Roswell Police Department headquarters at 39 Hill Street is proposed to be redeveloped into a mixed-use district with housing, retail, office, and public space. |
Not yet recorded: acres, GLA, year opened, original developer, what is there now, retrofit year. Know it? Tell us.
Timeline
- 2025 Mayor and Council approval of design package, sign plan, and closing documents
- 2025 Anticipated Closing
- 2025 Site preparation and demolition begin
- 2027 Expected issuance of certificates of occupancy
Sources
- Roswell Moves Forward With Transformative Hill Street Mixed-Use ...
5 quoted sentences
Hill Street Mixed-Use Development
October 14, 2025: Mayor and Council approval of design package, sign plan, and closing documents.
October 28, 2025: Anticipated Closing
Late 2025 / Early 2026: Site preparation and demolition begin.
More in Georgia
Phipps PlazaAtlanta, GA · 2018Partial Redeveloped · Partial redevelopment, mixed use